deutsche Version : english version

SCHMID Gruppe : SCHMID PEOPLEMOVER : Construction/assembly

A new way
Adaptable in design and dimensions.
Advantages

Construction/assembly

Video-archive
Career
News
Specials
Trade fairs
Downloads
Information
Contact

Faster crossing with new advantages

The countless advantages of this new-type people moving system include time-saving assembly. The first class overall design and well thought out construction enable the towers and bridge to be built and ready for operation within a maximum of three days, thereby reducing construction work (affecting traffic) to a minimum.


STSpowertrack

New innovative transport system

[more]

New image brochures:

Zum Download der Broschüren im PDF-Format

to PDF download

 

[more]

MOTEK

Date: 13.09. - 16.09.2010

City: New Trade Fair Centre Stuttgart (Airport)

The international trade fair for Assembly and Handling Technology

Search:

© SCHMID Maschinenbau 2008 / last update: 15.06.2010